NORFOLK AND WESTERN
Shenandoah Jct./N&WRY

Shenandoah Junction








February 9, 2019 at 1337, NS train 12R hurries across the former B&O at Shenandoah Jct, WV. for a meet with waiting train 16T.

After 12R has passed and all the scanner talk about "train looks good, marker hanging" is over, NS train 16T gets the signal and heads north out of the siding at 1343.

NS coal train 576 approaches the road crossing at Shenandoah Jct.

During a snow storm another NS train heads north on the main as a dwarf signal protects the connection from the B&O. Second photo is down the connecting track closer to the B&O/CSX, NS train 460 is doing some switching. In the 1990s, NS train 214 would drop its auto racks for CSX to pick up.

A NS train 290 south by the signal at Shenandoah Jct as a northbound train waits in the siding. The northbound then accelerates its train out of the siding and is heading for Hagerstown. (12-12-2017)

NS train northbound approaching the former "South End of Shenandoah Jct." also referred to as "Daniels" recently by NS. The right-of-way is being widened and grading is nearly complete to extend the passing siding at Shenandoah Jct. south to the Rt.9 bridge. (12-26-2013)






Go North on N&W
Go West on the B&O RR
Go to the B&O RR
Go South on N&W